Roadside tales

irishtown track works 31 5 17 (5)

DELWP works on the Irishtown track, May 31: the road is seven metres wide, plus scalped verge, plus numerous runoff sections. This bush track is as wide as a highway, and much wider than the nearby Fryerstown Vaughan bitumen road.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *